Biochemica was contacted regarding rapidly rising temperatures on a chilled system, imperative to the operation of an important plant process.

The critical temperature of >50C had been reached and as a result was close to causing a full plant shutdown.

Biochemcia was able to act immediately by having a fully trained engineer on site within hours and an action plan, with products and equipment, on site and implemented within 24 hours. Following the application of a specialty Biochemica product and follow-up recommendations, an immediate improvement in the system was observed. Improvements in performance were seen in the heat exchanger outlet tmeperature, which dropped from 51C to 36C.

An ongoing chemical treatment with recommendations was also prescribed to prevent a possible recurrance to such an important part of the plant process.